Windows and Boulders and Wells, oh my!!

10/13/2015

 
Lots of activity this week!

As of Monday, all the windows, except for a single window in the garage, are in place!
The largest window was delivered in two parts, which were assembled into one giant window on Friday.
The missing windows were also delivered over the weekend.
Monday, our wonderful framers (Chris and Corey), installed all three.  For the big giant window, they got some help from the phenomenal crew from Southview Design!

Southview Design is handling our landscaping, including the construction of a retaining wall along the south side of the house.  This allows us to get additional natural light downstairs, giving us some passive solar downstairs as well as on the main floor.

The guys from Southview helped as spotters on both sides while moving the window, muscle, and driver.  With little room left, and because I didn't want to get in the way, I took pictures;o)

These guys worked great together!  I was surprised how smooth it worked and can't express my thanks enough for the cooperation between the two crews.




Once the window was in place, the Southview Design crew went back to work carving out the "lookout" for the retaining wall on the south side of the house.
The retaining wall will be composed of these beautiful blue boulders, called Cold Spring Granite. These are from, surprisingly enough, Cold Spring Minnesota!  They are very "cubical", they stack easily and stably.  We will, of course, not be simply stacking them alone, there will be fill and other material to help with stability, prevent erosion and look nice.
Picture
Picture
To the left, you can see the first few boulders in the base row.  These will be partially buried to help provide a solid foundation.

​Below you can see the work in adding gravel to aid in drainage and structural stability.
The fabric is used between each row to help keep the soil in place.  I'll have more details on this soon.

Picture

The HVAC guys have positioned more air returns, which is wonderful, although I can't walk through walls like I used to!
The crew that will be drilling the wells for the GeoThermal arrived today to set up.  I am hoping the drilling will start tomorrow.
The electrical is almost done on the main floor.  We have a bit of fine measurements to do for some of the exterior outlets, lights, etc and a couple details inside.


Comments are closed.

    Author

    Mark really doesn't like to talk about himself, the house is much more interesting.

    Archives

    September 2020
    July 2018
    October 2017
    September 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015

    Categories

    All
    Cabinetry
    Carpentry
    Certifications
    Concrete
    Counters
    Data Measurement
    Decking
    Design Process
    Electrical
    Electric Cars
    Energy Conservation
    Foundation
    Framing
    Gameroom
    GeoThermal
    Ground Breaking
    Insulation
    Landscaping
    Painting/Mudding
    Plumbing
    Recycling
    Solar
    Thermal Mass
    Tours & Events
    Trusses
    Walls
    Water Management
    Windows

©Copyright 2017 Mark Hanson
Home             Blog             Partners             FAQ
  • Home
    • Health
  • Blog
  • Game room blog
  • Partners & Resources
  • FAQ