Driven to Net Zero
  • Home
    • Health
  • Blog
  • Game room blog
  • Partners & Resources
  • FAQ
Join us for the journey

Ohm Sweet Ohm

Follow by date, or click on any category that interests you.

This, that and the other thing...

7/31/2016

 
Lots of projects got started this week, and a few have been completed. ...

Read More

The devil is in the details

10/4/2015

 
Let me start by apologizing for the delay in this blog, last week was very, very busy!
I've also heard a few people would like to see more photos, so I am going to start adding more.  If anyone reading this has a suggestions please feel free to comment on any of the blogs.

The last couple of weeks we have had a number of parts of the house being worked on...

The waterproof membrane has been installed on the roof, making it much drier to work inside.

The plumbers have roughed in the pipes.  There are some fun details to get a little more efficiency out of the house.  
In the second photo in the gallery above you can see how a 'box' inside the wall was built for the laundry room plumbing.  This is behind the sink, where we will never miss the 4 inches of less depth.  
By not having the plumbing in the wall, it leaves room for insulation.
In the third photo, you can see our south wall by the kitchen.  Here, we didn't have room for placing the pipes anywhere but in the wall.  You can see how the plumbers wrapped the pipes.  
Around them, we will use a spray foam insulation.  The plumbers wrapped the pipes so as the pipes expand (when hot water is running through them) they don't squeak as they rub against insulation.
I never thought of that, but for my own sanity, I am very very happy they did!

The electrical work has been started.  I'm actually helping where I can with this aspect of the house where I can.  
I am very happy I have been more of a help than a hinderance so far;)
Some aspects (a few light fixtures, where switches go, etc) are still getting solidified.  There are a ton of decisions and options and it is all a bit overwhelming at times.
I  have a new appreciation for how wiring a house is as much an art form as a science!

We need to be careful to not run wire where the HVAC guys, or other contractors working on stuff in the walls, will need to be running vents, plumbing or other items.  Lengthwise, this isn't too big a deal.  When cables cross a line of a vent that isn't there yet, extra play in the cable needs to be left to allow the HVAC guys room to work around it without accidentally cutting the wiring.  Yet, not too much extra.  
I was also amazed at the bulk of the wire that is needed.   This house is about the average sized American house (2475 sq ft).  Yet, added all together, the mass of the wires is many hundreds of pounds.  

I have a new appreciation of the waste involved in over sized houses.  Our last house was far too big for the two of us, so I am very happy we have downsized.

The network/low voltage guys also finished their rough in this week.
The fourth photo in the gallery above is where the mechanical room will be.  The wiring on the left is some of the electrical wiring.  The garbage bag hanging on the right is the coiled up networking cabling which will be terminating in the mechanical room as well.

The HVAC guys roughed in their cuts for the vents.  The heating will all be in-floor radiant heat.  The air returns still need holes in the floors, walls, etc.  We have a lot of built in cabinets in our house.  As such, some of the vents will be in, or through part of the built in cabinets. 

In the window boxes, we are using a new type of liquid flashing in some areas.  It is the white material you can see along the top corner of the window box in the fifth image in the gallery.  
This fluid flashing is fairly new, it is very useful for complex geometries that are difficult to flash with other "peal and stick" flashings.
In the sixth and seventh images you can see another neat trick we are using.  The windows are being installed at the inside edge of the window boxes.  As the window casings are not the full depth of the wall, where the window ends we are installing a type of siding material.  We then wrap the siding (just as you would the outside of the house).
The surface is sloped away from the window frame, so water will not sit up against the edge of the window.

The roof of the screened in porch was also treated and waterproofed.  It will have a gentle slope so we can collect rainwater in one of our rain barrels.
In the eighth photo in the gallery you can see our architect up on top of the porch shortly before the waterproofing.  He was working on figuring out exactly where the vent from the kitchen exhaust will come out the side of the house.

This week, we also had a few bumps in the road.  There was some miscommunication about the placement of the window boxes in the main floor of the house.  They ended up all two and a half inches too low.  
When we first heard about this, we were very worried.  Chris and Corey, the framers, corrected the height of the windows over just a few days.  We are again very thankful that they could respond so quickly and worked over the weekend to correct this.

The windows also arrived, YAY!
One was the wrong size, BOO!
They are almost all in place already, YAY!
Two are missing, BOO!
It will all be ok, YAY! (just repeat, serenity now, serenity now, serenity now...)

This coming week, we have more electrical work, the windows to complete, the geo-thermal wells being drilled in the back yard (underneath a future rain garden) and the boulders for the retaining wall should be delivered.

In closing, I want to express my thanks to every one of our contractors, Kerry, our builder with Hage Homes, Marc our architect from SALA.  
Working onsite as much as I have has given me a better understanding for just how many details there are in building a house, managing many different craftsmen and trades, dealing with bumps in the road, and keeping everything on schedule.  I'll also be adding a couple more photos this week before next week's post.  I will add them to the gallery above.

    Author

    Mark really doesn't like to talk about himself, the house is much more interesting.

    Archives

    September 2020
    July 2018
    October 2017
    September 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015

    Categories

    All
    Cabinetry
    Carpentry
    Certifications
    Concrete
    Counters
    Data Measurement
    Decking
    Design Process
    Electrical
    Electric Cars
    Energy Conservation
    Foundation
    Framing
    Gameroom
    GeoThermal
    Ground Breaking
    Insulation
    Landscaping
    Painting/Mudding
    Plumbing
    Recycling
    Solar
    Thermal Mass
    Tours & Events
    Trusses
    Walls
    Water Management
    Windows

©Copyright 2017 Mark Hanson
Home             Blog             Partners             FAQ
  • Home
    • Health
  • Blog
  • Game room blog
  • Partners & Resources
  • FAQ